Military World
هل تريد التفاعل مع هذه المساهمة؟ كل ما عليك هو إنشاء حساب جديد ببضع خطوات أو تسجيل الدخول للمتابعة.

challenger 2 main battle tank

اذهب الى الأسفل

challenger 2 main battle tank Empty challenger 2 main battle tank

مُساهمة من طرف نسور مصرية السبت أبريل 02, 2016 11:17 pm

====================
challenger 2 main battle tank
========================


The Challenger 2 is the first British Army tank since World War II to be designed, developed and produced exclusively by a single prime contractor, Vickers Defence Systems, with set reliability goals laid down in the fixed price contract. The hull and automotive parts of the Challenger 2 are baised upon its predecessor Challenger 1, but Challenger 2 incorporates over 150 improvements aimed at increasing reliability and maintainability. The turret of Challenger 2 is a totally new design. Armour is an uprated version of Challenger 1's Chobham armour. The Challenger 2 is the best protected tank in NATO (10) incorporating Chobham second-generation armour plating. Its NBC (nuclear, biological and chemical protection) system is capable of dealing with all known threats and, for the first time in any British tank, the crew compartment has both a heating and a cooling system. I

challenger 2 main battle tank Cjk9575lqwd02vxzg

The main armament consists of a Royal Ordnance 120 mm rifled tank gun designated the L30. It also incorporates a McDonnell Douglas Helicopter Systems 7.62 mm chain gun, which is already in service in the British Army, being installed in the GKN Defence Warrior mechanised combat vehicle, and a 7.62 mm anti-aircraft machine gun. The Challenger 2’s fire control system is the latest-generation digital computer from Computing Devices Company (CDC) of Canada and is an improved version of that installed in the US M1A1 Abrams tank. It also has growth capacity for future enhancement such as a Battlefield Information Control System and navigation aids. The Challenger 2 carries a crew of 4 and has a combat weight of 62.5 tonnes. It has a maximum road speed of 56 km/h and a range of 250 km cross country and 450 km on the road. I

challenger 2 main battle tank B8d1rp9s1mnuu3tzg

The Challenger 2 (CR2) project includes the development and production of 386 CR2 Main Battle Tanks (MBTs), 22 Driver Training Tanks (DTTs), CHARM 3 ammunition and a full support package including training equipment and initial spares. i

Prime Contractor is Vickers Defence Systems plc. Vickers Defence systems started work on the Challenger 2 in November 1986 as a private venture and shortly afterwards, in March 1987, made its first presentation of the vehicle to the British Ministry of Defence. In February 1988, Vickers submitted a formal proposal regarding the tank to the MOD following the issue of the staff requirement. In December 1988 it was announced that Vickers Defence Systems was to be awarded a £90 million contract to undertake a demonstration phase (also referred to as the proof of principle phase) which lasted until September 1990. i

challenger 2 main battle tank 52zr8j4raydgx63zg

In June 1991 the British Government selected the Challenger 2 and placed an order worth £520 million for 127 Challenger 2 MBTs and 13 driver training tanks. Production began in 1993 and the first vehicles were delivered in July 1994 . i

The Challenger 2 is produced at the Vickers Defence Systems plants in Leeds and Newcastle.There are over 250 subcontractors ( both UK and Overseas ) involved at some point in the manufacturing process . Among the most significant are : Royal Ordnance (Main and Secondary armaments); Blair Catton (Track) ; and GEC-Marconi (Gun Control) . i

challenger 2 main battle tank S56bd9gageed39czg

The requirement to replace most of Challenger 1 tanks (CR1) MBT led to the placement of a follow-on order with Vickers Defence Systems. In July 1994, Vickers Defence Systems received a further order from the UK MOD for the supply of 259 Challenger 2 tank and nine driver training tanks plus training and logistic support. The total value of this contract is £800 million and this means that production of the Challenger 2 will be continued at least until the year 2000 and that the British Army will be equipped with Challenger 2s while the Challenger 1 will be phased out. i


The CR2 In-Service Reliability Demonstration (ISRD) milestone was successfully achieved in January 1999. The ISRD took place from September to December 1998 and trialled 12 British Army crewed MBTs at the Bovington test tracks and Lulworth Bindon Ranges. The ISRD was a great success in that CR2 not only achieved the targets but exceeded them in all areas set by the Customer’s Staff Requirement. i

The Royal Scots Dragoon Guards in Germany, the first of six post-SDR Armoured Regiments, started to take delivery of the CR2 in January 1998 and received the 38th in time to meet the June 1998 in-service date. Deliveries of CR2 are continuing and it is planned that each of the six Armoured Regiments will be fully equipped with their tanks and associated logistic support package by end of 2000. i


challenger 2 main battle tank 55u5m3grv6eb189zg

The conversion from CR1 to CR2 Regiments is being assisted by a comprehensive suite of training aids, ranging from simple wall charts to highly sophisticated, computer-baised gunnery simulators. A range of CR2 training aids and support equipment are also being provided for the Royal Electrical and Mechanical Engineers (REME) to assist the task of fault diagnosis, test, repair, calibration & system performance monitoring. i

Challenger 2E has been specifically designed for demanding environmental and climatic conditions and represents the latest evolution of the highly effective family of Challenger vehicles.i

challenger 2 main battle tank 3y65vb8yum0lh1nzg

Specifications : i
Combat Weight : 62,500 kgs .i
Crew Size : 4 .i
Combat Weight : 62,500kg .i
Length (hull) : 8.327m .i
Length (gun forward) : 11.55m . i
Width (over skirts) : 3.52m .i
Height (to turret roof) : 2.49m .i
Ground Clearance : 0.5m .i
Max Road Range : 450km .i
Engine : Rolls-Royce Perkins Condor CV12 1200bhp with new engine management system .i
Gearbox : David Brown TN54 epicyclic, 6 fwd 2 rev SuspensionHydrogas variable spring rate .i
Track : Blair Catton hydraulically adjusted double pin .i
Speed : 59 kph .i
Main Armament : Royal Ordnance 120mm L30 gun .i
Ammunition : CHARM 1 and 3, HESH and Smoke .i
Ammunition Carried : Typically 50 rounds - APFSDS, HESH, Smoke .i
Secondary Armament : Hughes 7.62mm coaxially mounted chain gun and 7.62mm loader’s GPMG Turret Mounted for Air Defence .i
Ammunition Carried : 4000 rounds 7.62mm .i
Armour : DORCHESTER .i
نسور مصرية
نسور مصرية
Admin

عدد المساهمات : 24
تاريخ التسجيل : 27/03/2016
العمر : 36
الموقع : كوكب المريخ

الرجوع الى أعلى الصفحة اذهب الى الأسفل

الرجوع الى أعلى الصفحة

- مواضيع مماثلة

 
صلاحيات هذا المنتدى:
لاتستطيع الرد على المواضيع في هذا المنتدى